Detached accessory dwelling unit with private entry and landscaping

Small projects, same team

ADUs and garage conversions, priced honestly before you draw a line

Our portfolio has large commercial and estate projects in it, and that puts some homeowners off. It should not. A single ADU gets the same feasibility review, the same permit management and the same construction discipline as a ground-up commercial building, scaled to a residential budget.

Yes, we take one-unit projects

Most homeowners who call us start the conversation apologising for the size of their project. There is nothing to apologise for. ADUs are among the most constraint-driven projects in California: state law, local objective standards, utility capacity and fire access all interact, and a small mistake early costs more than the design fee saved. That is exactly the work we do all day.

You get a fixed-fee feasibility review first. If your lot or your numbers do not support the project, we will say so in the first two weeks instead of selling you a full design package.

  • Fixed-fee feasibility, not an open-ended retainer
  • One team for design, permits and construction
  • Cost range before drawings, not after
  • Rental math checked before you commit
  • Fire rebuild projects prioritized
  • Offices in Santa Monica and Fullerton

Get an ADU cost range

Send your name and email and we will follow up with the questions that set your range. Sandra receives this immediately.

Straight to the studio inbox. No sales lists, no spam.

What ADUs cost in Southern California

Planning ranges for 2026, all-in including design, permits, fees and construction. Your number moves with utility distance, grading, and finish level.

TypeTypical sizeAll-in rangeWhat drives it
Garage conversion350 to 500 sq ft$120k to $220kExisting slab and walls, utilities usually nearby. Fastest route to a legal unit.
Attached ADU500 to 800 sq ft$220k to $380kShares a wall and often utilities with the main house. Good on tight lots.
Detached new build600 to 1,200 sq ft$300k to $650kNew foundation, new utility runs, full design freedom and the strongest rental value.
Junior ADUUp to 500 sq ft$90k to $180kCarved from the existing house with an efficiency kitchen. Lowest cost entry point.

Planning estimates for scoping conversations. Not a quote.

The ADU process, start to certificate of occupancy

01 · 1 to 2 weeks

Feasibility review

We check your lot against state ADU law and your city's objective standards: setbacks, height, coverage, fire access, utility capacity and easements. You get a go, no-go or modified-scope answer with a cost range.

02 · 4 to 8 weeks

Design and engineering

Floor plans, elevations, structural, Title 24 energy compliance and the site plan. We design to the budget range agreed in step one rather than designing first and pricing later.

03 · 6 to 12 weeks

Permits and plan check

We submit, track and clear corrections, coordinate utility clearances and handle school, sewer and capacity fees. State law caps ADU review at 60 days per cycle, corrections are what add time.

04 · 4 to 7 months

Construction

Fixed line-item budget, weekly progress and cost reporting, one point of contact, final inspection and certificate of occupancy so the unit is legally rentable.

Ask the Plantek West project advisor

A trained assistant using how we actually scope Southern California projects. Ask about cost ranges, permits, code or sequencing and get a straight answer in seconds. For site-specific numbers we still recommend a feasibility review.

Free download

The Southern California ADU Guide

Costs, code, timelines and rental math for 2026. 3 pages, no fluff.

  • What an ADU realistically costs per square foot, by construction type
  • State law vs. city overlays: setbacks, height, parking and owner occupancy
  • The permit sequence in LA, Orange and Ventura counties, step by step
  • A rent-vs-cost worksheet to test whether the numbers work on your lot

Send me the ADU guide

Enter your email and the PDF unlocks immediately.

Straight to the studio inbox. No sales lists, no spam.

ADU questions we answer every week

How much does an ADU cost in Southern California?

Most detached ADUs we scope land between roughly $250 and $450 per square foot of finished space, with garage conversions at the lower end and new detached structures with new utility runs at the higher end. The spread comes from three things: how far utilities have to travel, whether the site needs grading or retaining, and finish level. We price these three drivers first so you get a range you can trust before drawings begin.

Do I need to be wealthy to work with Plantek West?

No. Our portfolio shows large commercial and estate work because those projects photograph well, but a large share of our work is single ADUs, additions and remodels. Small projects use the same process, just scaled: a fee-based feasibility review, a clear budget range, permit management, then construction. We publish an ADU-specific starting point so you can see where you fit before you call.

How long does an ADU take from first call to move in?

Plan on 3 to 5 months for design and permitting and 4 to 7 months for construction, so roughly 9 to 12 months total for a detached unit. Garage conversions can be faster. State-mandated 60-day ADU permit review helps, but corrections, utility clearances and school or sewer fees are what usually add time.

Can I build an ADU and a junior ADU on the same lot?

In most single-family situations in California you can pair one ADU with one junior ADU, subject to your city's objective standards. The lot geometry, fire access and utility capacity decide whether it is practical. We test that in a feasibility review before you spend money on full drawings.

Will an ADU pencil out as a rental?

That depends on submarket rent, your financing cost and the all-in build number. Our ADU guide includes the same worksheet we use with clients: all-in cost, monthly carrying cost, market rent and the break-even point. If it does not pencil, we will tell you before design starts.

Do I need an architect, a contractor, or both?

You need both roles, but not necessarily two contracts. We hold design, permitting and construction management under one accountable team, which removes the gap where drawings do not match what can actually be built for the budget.