
Residential and ADU
Most disappointing ADU projects were decided before drawings started: a utility run nobody priced, a setback that shrank the unit, or a rent assumption that never covered the build. An ADU feasibility study answers all of it for a fixed fee, and rolls into design if the numbers work. Southern California lots vary enormously, and most ADU questions are really lot questions: which lots have the setbacks, access and utility capacity to carry a second unit.
What the lot supports once setbacks, access and utilities are applied.
A range by construction type, with the three cost drivers priced first.
All-in cost against market rent and carrying cost.
Proceed to design, change the approach, or stop before spending more.
Tell us the address and what you want to do with it. You get a written answer on whether it works, what it will roughly cost and what approvals it needs.
It is a fixed fee, and it is a small fraction of a full design fee. If the study says the project does not work, that fee is the cheapest money spent on the project.
Ask about this on the call. The study is written so its program, budget and constraints feed straight into design, so nothing in it is wasted work.