Hospitality patio lounge with fire feature and lamps at dusk

Hospitality and retail

Build-outs, refreshes and rollouts on operating schedules

Hospitality and retail projects are judged on opening dates. We plan the phasing, the long-lead procurement and the inspection sequence first, then build to it, whether that is one restaurant or a program across many locations.

Build-outs

New restaurant, cafe, clinic and retail build-outs from shell or existing space, including health department and utility coordination.

Refreshes and upgrades

Guest room, lobby and dining refreshes delivered in phases so revenue keeps running.

Interiors and FF&E

Interior packages, finishes, furniture and equipment procurement, install sequencing and punch.

Rollout programs

Repeatable prototypes across multiple locations with per-site permitting and consolidated reporting.

Brands we have delivered work for

  • Taco Bell
  • Citibank
  • Westfield
  • KFC
  • Pluto TV
  • Pizza Hut
  • Sheetz
  • Edition
  • CBRE
  • AT&T
  • Amgen
  • Williams-Sonoma
  • 7-Eleven
  • Hilton
  • Luxottica
  • Hilton Garden Inn
  • Uber
  • GNC

Hospitality and retail questions

Can you work while our location stays open?

Yes. Occupied and operating work is normal for us: night and weekend windows, temporary partitions and dust control, phased handovers, and inspections scheduled around service hours. We plan the phasing before pricing, because phasing is what drives the cost.

How do you handle brand standards across multiple sites?

We build to the prototype package and maintain a deviation log per site. Landlord conditions, local code and existing building conditions always force some variation, so we document it and get brand approval rather than improvising in the field.

What is a realistic restaurant build-out timeline?

From signed lease to opening, plan on 7 to 12 months: 4 to 8 weeks of design, 8 to 16 weeks of permitting including health department review, then 12 to 20 weeks of construction. Long-lead kitchen equipment and utility upgrades are the two items that most often move the opening date.

Do you manage FF&E and vendor coordination?

Yes, including furniture, fixtures and equipment procurement, signage vendors, low voltage, AV and specialty trades, plus the sequencing between them and the general contractor.

Talk about a location or a program

Give us the site, the brand standard and the target opening date.

Straight to the studio inbox. No sales lists, no spam.