Commercial and development
Preconstruction is where money is actually saved. Cost modelling as the design develops, constructability review before drawings are finished, long-lead procurement identified early, and a schedule built from real sequencing rather than optimism.
Line-item cost built at concept and updated at every milestone.
Drawings tested for buildability, coordination and code exposure.
Procurement, phasing and schedule mapped before mobilisation.
A bid-ready package with the assumptions documented.
Tell us the address and what you want to do with it. You get a written answer on whether it works, what it will roughly cost and what approvals it needs.
A bid tells you what a drawing set costs once it is finished. Preconstruction tells you what the design will cost while it can still be changed, which is the only point where a number can be influenced without losing scope.
Yes. Preconstruction and cost validation are regularly delivered as standalone services, including for owners working with another general contractor.