A residential project should start with the site and the budget, not with a rendering. We run a paid feasibility review first, agree a realistic range, then design and build to it. Small projects welcome, including single ADUs.

Three residential tracks

Modern multi-level residence at sunset with pool and terraces

New construction

Custom homes

Ground-up single family from lot due diligence and entitlements through interiors and landscape coordination.

Indoor outdoor living room opening to a pool deck at dusk

Most common request

Remodels and additions

Kitchens, primary suites, second stories and reconfigurations, including occupied-home phasing.

Hillside estate with pool, lawn and mature landscaping

Prioritized intake

Fire rebuilds

Design and plan submittal support for owners rebuilding after the Eaton and Palisades fires.

Thinking about an ADU instead?

ADUs and garage conversions have their own rules, costs and timelines. We keep a separate page with real cost ranges and a free guide so you can check the numbers before calling anyone.

See the ADU page

Where residential budgets actually go

8 to 14%

Design and engineering

Architecture, structural, Title 24, surveys and soils where required.

2 to 6%

Permits and fees

Plan check, school, sewer and capacity fees vary widely by city.

72 to 85%

Construction

Labor, materials, subcontractors and general conditions.

8 to 12%

Contingency

Held for unknowns behind walls and under slabs. Budget it on purpose.

Residential questions, answered

What does a whole-house remodel cost in Southern California?

Cosmetic remodels commonly run $150 to $250 per square foot. Once you move walls, touch structure, or upgrade electrical, plumbing and mechanical systems, expect roughly $300 to $550 per square foot, and higher on hillside or coastal sites. We give a range at feasibility, before design fees start.

Do I need permits for my remodel?

Any structural change, new or relocated plumbing and electrical, window or door openings, roof work, and most exterior changes require permits. Kitchens and bathrooms almost always do. Unpermitted work becomes a disclosure problem and a valuation problem when you sell or refinance.

How long does an addition take?

Plan on 2 to 4 months for design, 2 to 4 months for permitting, and 5 to 9 months of construction depending on scope and whether you occupy the house during the work. Hillside, coastal and historic overlay sites add review time.

Can you help with a fire rebuild after the Eaton or Palisades fires?

Yes. We support rebuild owners with design and plan submittals to move approvals along, and we prioritize these projects in intake. Insurance documentation, like-for-like versus improved rebuild decisions, and current code upgrades are all part of the scope conversation.

Can I stay in the house during construction?

Often yes for additions and phased work, rarely for whole-house structural remodels. We will lay out both options with the cost and schedule difference so you can choose with the numbers in front of you.

What if I already have an architect?

That is fine. We can join as construction manager or owner's representative, validate the budget against the drawings, and manage permits and construction from there.

Tell us about your home project

Share the city, the scope and your timeline. You will hear back within one business day.

Straight to the studio inbox. No sales lists, no spam.

Ask the Plantek West project advisor

A trained assistant using how we actually scope Southern California projects. Ask about cost ranges, permits, code or sequencing and get a straight answer in seconds. For site-specific numbers we still recommend a feasibility review.