Design-build puts drawings and construction under one accountable party. That removes the most common source of change orders: a design nobody priced until it was too late to change. One design build contractor holding both halves removes the gap where a contractor blames the drawings and a designer blames the build.
Program, budget and site tested together before drawings.
Cost model updated at every design milestone.
Approvals pursued while long-lead procurement starts.
One team, one schedule, one line-item budget.
Tell us the address and what you want to do with it. You get a written answer on whether it works, what it will roughly cost and what approvals it needs.
Not always cheaper on paper, but usually cheaper in outcome. Design-bid-build can produce a sharper hard bid when scope is fully defined. Design-build tends to compress schedule and reduce the change orders that come from drawing gaps.
We advise on delivery during feasibility rather than defaulting to one. Fully defined scope with no schedule pressure favours design-bid-build. Speed, complexity or an occupied building favours design-build.