Representing the owner's interest through budget, schedule, procurement and field decisions, whether or not we are holding the trades. In Malibu that work is reviewed by City of Malibu Environmental Sustainability and Building Safety, with LA County Fire, with strict fuel modification review involved where access, alarms or suppression apply. Malibu rewards patience and punishes optimism. We front-load geology, septic and fuel modification because those three decide whether a project exists.
Malibu sits in Coastal, inside Los Angeles County, and plan review runs through City of Malibu Environmental Sustainability and Building Safety. On the commercial side, limited commercial, mostly small retail and restaurant along PCH with heavy coastal scrutiny. Base building condition decides most of the budget before a single finish is selected.
Before we draw anything we run a feasibility review against your specific address. For construction management and owner's representation that means testing budget development and validation, bid packages, levelling and award recommendations, schedule development and weekly tracking, and confirming which of the local overlays apply to your parcel. Getting a no in week one costs you a small fee. Getting a no in month five costs you a design.
Once feasibility comes back workable, we produce a permit set that anticipates how this particular department reads the code, submit it, and manage the corrections ourselves. Typical experience in Malibu is 12 months or more from application to permit is normal once coastal, geology and wastewater run in sequence. On fees, consultant fees for geology, biology and wastewater usually exceed city permit fees.
Construction management is typically engaged as a percentage of construction value or a fixed monthly fee, and on projects with meaningful complexity it commonly returns more than it costs through bid competition and change order control.
Those ranges are honest averages, not quotes. The variables below are the ones that actually move the number on a Malibu project, and they are the first four things we investigate.
Scope definition
Most change orders are not surprises, they are gaps in the original scope documents. Tightening those documents is the cheapest cost control there is.
Long-lead items
Switchgear, HVAC equipment and glazing dictate the schedule far more than labour availability. They get ordered first.
Decision latency
Owner decisions that sit for a week cost more than most material escalation. We work to a decision log with dates.
Field verification
Existing conditions rarely match the record drawings. Verifying early converts a mid-project crisis into a planned adjustment.
We prefer to be engaged before the drawings are complete, because the biggest cost decisions are made during design, not during construction.
Layered onto that, Malibu review typically takes 12 months or more from application to permit is normal once coastal, geology and wastewater run in sequence. Where one of the local overlays applies, add its process to the front of the schedule rather than assuming it runs in parallel.
We work across Malibu ZIP codes 90265 and 90263, and the neighbourhoods most represented in our Malibu work are Point Dume, Malibu Park, Carbon Beach, Serra Retreat. Where your parcel sits inside the city changes which overlays and which reviewers you meet.
We give you a written schedule with the approval milestones named, so you can see which dates we control and which belong to an agency. Nobody can compress a hearing calendar. Everybody can submit a complete package the first time, and that is where the recoverable weeks are.
Send the Malibu address and a sentence about the project. You get a written feasibility answer covering approvals, realistic cost and schedule.
City of Malibu Environmental Sustainability and Building Safety, with LA County Fire, with strict fuel modification review reviewing access, alarm and suppression scope where it applies. Malibu rewards patience and punishes optimism. We front-load geology, septic and fuel modification because those three decide whether a project exists.
Expect 12 months or more from application to permit is normal once coastal, geology and wastewater run in sequence. We prefer to be engaged before the drawings are complete, because the biggest cost decisions are made during design, not during construction. We name the agency-controlled milestones separately in your schedule so you can see what is ours and what is theirs.
Construction management is typically engaged as a percentage of construction value or a fixed monthly fee, and on projects with meaningful complexity it commonly returns more than it costs through bid competition and change order control. Locally, consultant fees for geology, biology and wastewater usually exceed city permit fees. We price the three biggest variables at feasibility so the first number you see is close to the last one.
The ones that come up most are: Local Coastal Program and Coastal Development Permits; Onsite wastewater treatment system review; Fuel modification and Very High Fire Hazard Severity Zone standards; Geology and coastal hazard review on bluff and beach parcels. We confirm which apply to your parcel before design rather than discovering one at plan check.
We take construction management and owner's representation work across 90265 and 90263, plus surrounding unincorporated pockets. If your ZIP is not listed, send the address anyway and we will tell you plainly whether we are the right team for it.
A general contractor holds the trade contracts and carries the construction risk. A construction manager represents you, reviews what the contractor proposes, and has no financial interest in the change orders. On complex projects, owners often want both roles filled by different parties.
Yes. We review the contract, the budget and the schedule, then run the reporting and change control from the owner's side. It is common on projects where the owner has lost visibility.
A weekly report with cost to date, forecast at completion, schedule status, open decisions with dates and photographs of progress. Nothing in it should ever be a surprise at the next meeting.
For the full statewide scope of this work, read our construction management service page, or see the Malibu service area overview.
Send the address, including the ZIP code, and what you want to build. We come back with what the City of Malibu Environmental Sustainability and Building Safety route looks like, a realistic budget range and a schedule.