Kitchen, bath, second-storey and whole-house work, designed and permitted properly so the finished result appraises and sells as legal square footage. In Santa Monica that work is reviewed by City of Santa Monica Building and Safety, with Planning review for most exterior work, with Santa Monica Fire Department involved where access, alarms or suppression apply. Our office is on Ocean Park Blvd, so most Santa Monica work is a short drive and we can walk a correction into the counter rather than mail it.
Santa Monica sits in Westside, inside Los Angeles County, and plan review runs through City of Santa Monica Building and Safety, with Planning review for most exterior work. The housing stock matters here: 1920s to 1950s bungalows and duplexes on 5,000 to 7,500 sq ft lots, many with detached garages on the alley. That existing condition, more than any design preference, sets what is straightforward and what is expensive.
Before we draw anything we run a feasibility review against your specific address. For home addition and remodel design that means testing existing conditions survey and as-built drawings, addition and remodel design, structural design for openings, second storeys and foundations, and confirming which of the local overlays apply to your parcel. Getting a no in week one costs you a small fee. Getting a no in month five costs you a design.
Once feasibility comes back workable, we produce a permit set that anticipates how this particular department reads the code, submit it, and manage the corrections ourselves. Typical experience in Santa Monica is roughly 8 to 14 weeks to permit on a typical residential submittal, longer where coastal review applies. On fees, school, water capacity and wastewater fees are meaningful here and belong in the first budget, not the last.
Additions generally run roughly $350 to $600 per square foot depending on complexity, with kitchens and baths priced by scope rather than area.
Those ranges are honest averages, not quotes. The variables below are the ones that actually move the number on a Santa Monica project, and they are the first four things we investigate.
Foundation
Adding load to a 1920s foundation usually means underpinning or replacement in the affected area, and that shows up as a real line item.
Roof and structure
A second storey is a structural project with a finish layer, not a finish project. Load path is the first drawing, not the last.
Systems age
Knob and tube wiring, galvanised supply and cast iron waste all get triggered by permitted work. Better to plan for them.
Occupied construction
Living in the house during the work is possible, and it lengthens the schedule. We price both scenarios so you can choose.
Design and permitting usually takes 3 to 5 months, and construction of a meaningful addition runs 5 to 10 months.
Layered onto that, Santa Monica review typically takes roughly 8 to 14 weeks to permit on a typical residential submittal, longer where coastal review applies. Where one of the local overlays applies, add its process to the front of the schedule rather than assuming it runs in parallel.
We work across Santa Monica ZIP codes 90401, 90402, 90403, 90404 and 90405, and the neighbourhoods most represented in our Santa Monica work are Ocean Park, Sunset Park, Wilshire Montana, Pico, North of Montana. Where your parcel sits inside the city changes which overlays and which reviewers you meet.
We give you a written schedule with the approval milestones named, so you can see which dates we control and which belong to an agency. Nobody can compress a hearing calendar. Everybody can submit a complete package the first time, and that is where the recoverable weeks are.
Send the Santa Monica address and a sentence about the project. You get a written feasibility answer covering approvals, realistic cost and schedule.
City of Santa Monica Building and Safety, with Planning review for most exterior work, with Santa Monica Fire Department reviewing access, alarm and suppression scope where it applies. Our office is on Ocean Park Blvd, so most Santa Monica work is a short drive and we can walk a correction into the counter rather than mail it.
Expect roughly 8 to 14 weeks to permit on a typical residential submittal, longer where coastal review applies. Design and permitting usually takes 3 to 5 months, and construction of a meaningful addition runs 5 to 10 months. We name the agency-controlled milestones separately in your schedule so you can see what is ours and what is theirs.
Additions generally run roughly $350 to $600 per square foot depending on complexity, with kitchens and baths priced by scope rather than area. Locally, school, water capacity and wastewater fees are meaningful here and belong in the first budget, not the last. We price the three biggest variables at feasibility so the first number you see is close to the last one.
The ones that come up most are: Coastal zone review on properties west of Lincoln Blvd; Objective design standards for multi-unit and ADU projects; Preapproved ADU plan program; Landmark and structure-of-merit review on older blocks. We confirm which apply to your parcel before design rather than discovering one at plan check.
We take home addition and remodel design work across 90401, 90402, 90403, 90404 and 90405, plus surrounding unincorporated pockets. If your ZIP is not listed, send the address anyway and we will tell you plainly whether we are the right team for it.
Often yes, subject to height limits, setbacks and whether the existing foundation and framing can carry the load. The foundation answer is the expensive one, so we investigate it during feasibility rather than after design.
It can. Once you pull a permit, the department sees the whole property. Unpermitted space usually has to be legalised or removed. We would rather find it in week one and plan for it than have an inspector find it in month six.
Not with us. We handle design, permitting and construction under one agreement, so there is nobody to blame when a drawing and a field condition disagree.
For the full statewide scope of this work, read our additions & remodels service page, or see the Santa Monica service area overview.
Send the address, including the ZIP code, and what you want to build. We come back with what the City of Santa Monica Building and Safety route looks like, a realistic budget range and a schedule.